A bright modern bathroom with a freestanding bath and a white vessel basin.

Work areas

Unvented cylinders

An unvented cylinder stores hot water at mains pressure, so the showers and taps are fed without a tank in the loft. It is fitted with the heating, not bolted on afterwards.

The cylinder is sized for the bathrooms and the incoming mains. Discharge pipework and the safety controls are part of the install, and the system is filled and run before it is handed over.

It can replace an old vented tank-and-cylinder arrangement, or go in with a new boiler. Where mains pressure is poor, that is said before the cylinder is ordered.

What we do

  • Mains-pressure hot water
  • Sized for the bathrooms
  • Safety controls and discharge pipework
  • Tied in with the boiler